Winton Community Academy

  • Client

    Hampshire County Council 

  • Contractor

  • Value

    £5m

  • Completion Date

    August 2024

The Challenge

Challenge 1 

Winton Academy was a logistically tight and challenging site. This was due to the fact that construction was surrounded on all four sides by live class blocks and with a farm within close proximity. 

Challenge 2 

There was great emphasis placed on the quality of the new facility; however due to the lack of space on site, the team were unable to accommodate a ‘benchmark’ room. 

The Solution 

Solution 1 

To manage the logistically challenging site, a thorough and robust plan of action for safety on the project was required, including the following: 

Frequent and regular communication with the school, client and all stakeholders involved 

‘Just in Time’ deliveries were opted where possible, due to minimal storage space on-site 

The project team segregated the site with hoarding 

‘Movement times’ required on the project meant if there were any deliveries, the team could only move materials during certain periods of the day 

Further barriers such as Heras fencing were installed to segregate the team from the school and the farm 

Solution 2 

The team had samples for a number of materials that would be used throughout the project, including: 

CLT  –  Brickwork Mortar  – Flooring 

Along with the material samples, the team undertook daily inspections which were recorded on the Site Information Management System. Additionally, weekly quality inspections were undertaken by the client and third-party inspections were undertaken of the flat roof installation, with a written report provided. Lastly, 360o photographic evidence via Oculo was used on the project to ensure Quality Assurance. 

The Results

The team successfully mitigated the impact of the site works to both the school and local community, as demonstrated in the Considerate Constructors Site Report which achieved 15/15 for ‘Respect the Community’ and Customer Experience Questionnaire (CEQ) which scored 10/10 for safety 

6

Apprentices

85%

SME Spend

£658k

Added Value

10/10

Client Satisfaction

Contractor Performance | Commitments

Legacy

39 No of SMEs 18 beneficiaries7 jobs created  – 53 trainee weeks 

Schools engagement: 2955 students  &  131 hours  

£175 donations to charity  – £2.32 LM3 

78% social value created  – 88% local spend 

Sustainability

100% waste diverted from landfill 

100% timber responsibly sourced 

Aftercare

Soft landings for handover  and a dedicated Morgan Sindall point of contact 

On-line portal for notifying any defects with 3 priority categories for response times 

Safe

Zero RIDDORS – CCS Score 44/45 

Fair

100% payment within 30 days terms

Client Testimonials

“Been a very positive experience, comes down to the team on site and we had very good people on the project which made the whole project run smoothly. A pleasure working with the whole team.”