• SCF Client Portal
Logo
  • Support
    • Working with SCF
    • Meet the team
  • Our Frameworks
    • SCF Construct
      • Partnering Contractors
    • SCF Intermediate
      • Intermediate contractors
    • SCF Consult
      • Consultant Partners
  • Our Projects
    • Case Studies
    • Video Testimonials
    • SCF Social Value
  • Resources
    • Market Intelligence
    • Sustainability
    • Contractor and Suppliers Support
    • SCF Documents
    • SCF Passport Training
    • Building Safety Act 2022
  • SCF6 Procurement
  • News
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu

Barnet Waste Transfer

London

  • Client

    London Borough of Barnet

  • Contractor

    Willmott Dixon logo

  • Value

    £11.9m

  • Completion Date

    July 2017

Project Team

Architects: Capita

Electrical: Capita

MEP: Capita

The project was a design and build development of Oakleigh Road South Vehicle Depot to create a Barnet Council vehicle depot and a base for their fleet of 46 household recyclable waste collection vehicles.

The Challenge

There were several challenges faced throughout this project. There was restricted access on a long and narrow site which caused difficulties when trying to overcome other challenges such as dealing with the below ground water, removing underground drainage structures and the buried hazardous waste.

The Solution

To overcome the narrow site, the Willmott Dixon team worked in a ‘patchwork’ fashion, sectioning off the works and moving operations around to keep the access road fully open throughout the build.

Willmott Dixon found existing sewers and then got permission from Thames Water to use them instead for the below ground water. They found a solution using a land drain pump to drain the ground water which was causing surface water.

The Results

Now built, the depot will allow Barnet Council to operate its vehicle maintenance and recycling collection fleet from single coordinated site, ensuring the most efficient service for residents across the borough. The construction also consisted of a tractor barn and car parking, together with associated ancillary facilities, a recycling waste transfer building and bulking facility, a two storey office and welfare building.

2

New Apprenticeships

Apprentices

88%

SME Spend

£1.2m

Raised levels by introducing engineered ground geotextile, saving £720k
Resulting in programme saving £110k
Added surveys resulting in reduced risk on hazardous waste, saving £205k

Added Value

9/10

Client Satisfaction

Contractor Performance | Commitments

Fair

Regular payments and payment periods did not exceed 30 days

Sustainability

Early contractor engagement realised that by raising finished floor levels by introducing an engineered ground geotextile design produced a saving of c£720k, helping significantly reduce excavated materials

Safe

Zero RIDDORs

Legacy

2 starter apprentices who went on to gain full time graduate employment

Aftercare

SCF handover and aftercare promised carried out

SCF Framework Manager

Alex Nelhams

Email: alex.nelhams@hants.gov.uk

Phone: 07717 003869

Contractor Framework Manager

Guy Dawes

Email: guy.dawes@willmottdixon.co.uk

Phone: 07989179444

SCF Logo White

Two Stage Open Book Procurement delivered by the public sector, for the public sector.

  • Cookie Policy
SCF is a member of NACF, a national collective of regional frameworks which shares best practice expertise and experience.
© 2026 - Website by Blaze Concepts
Link to: Middlemoor Criminal Justice Centre Link to: Middlemoor Criminal Justice Centre Middlemoor Criminal Justice Centre Link to: BoFL Croydon Regional Centre Link to: BoFL Croydon Regional Centre BoFL Croydon Regional Centre Scroll to top Scroll to top Scroll to top