Live university campus
During the course of the Theatre refurbishment, all of the surrounding areas were fully occupied by either students, academics or were the subject of construction work. Overbury successfully delivered the 36 weeks project without disruption by diligently planning and sequencing the works, ensuring all live and transient services were maintained, while liaising with a wide variety of stakeholders.
3D modelling
As the project was being designed in a 3D environment, but with the absence of an existing model of the buildings structure, additional point cloud surveys were utilised during the strip out and enabling phase to assist in developing the building services model and co-ordination with structure.
Scaffold design
In order to work at high level and low level simultaneously, a birdcage scaffold was utilised, along with a number of other innovative scaffold designs, in order for works to adjacent areas to progress concurrently.
During the Theatre refurbishment, all areas were fully occupied by either students, or were the subject of construction work.
At no point were any occupants, adjacent buildings or building projects disturbed during our 36 weeks on site, and all live and transient services were maintained throughout
Programming was a challenge particularly towards the end of the project, but we flagged issues early, provided extra staff to mitigate any impact, and updated on our progress weekly.
15 SMEs (9 local), 13 beneficiaries, 3 jobs created, 130 trainee weeks
Schools engagement: 949 students
£1.93 LM3, 92% social value created
16.2 tonnes carbon equivalent saved in Morgan Sindall’s 10 Tonne Carbon Challenge by changing the heat protection tile supplier to a UK supplier, reducing number of and distance of deliveries
98% waste diverted from landfill
7 biodiversity enhancements
Soft landings for handover
Dedicated Morgan Sindall point of contact
On-line portal for notifying any defects with 3 priority categories for response times
Zero RIDDORS
CCS Score 40/45
100% payment within 30 days terms